As the BGLR locomotive fleet gets bigger (though the layout doesn't) we've had to adjust our rotation policy to give more locos a go. We've decided to rotate the position of engineering train motive power, the Motorbahnwagen will share the duties with one of the shunter fleet every six months. Ruby thus has taken over this duty and is likely to continue until the Spring, then the Motorbahnwagen will return until the Autumn when it is likely Tango will take over.
Showing posts with label HO9 Operations. Show all posts
Showing posts with label HO9 Operations. Show all posts
Tuesday, November 6, 2018
Friday, April 6, 2018
Old and new
Black Beauty has continued it's proving testing and will be handed over to the Operations Dept. by the Integration & Testing Dept this weekend. It is running well, of course the technology is pretty well proven. After all it is the same loco type as Falcon and Growler - the former being the oldest loco on the layout with over five years service now!
The Infrastructure Dept. meanwhile has completed the underlay for the tramline, something more permanent can be laid now.
The Infrastructure Dept. meanwhile has completed the underlay for the tramline, something more permanent can be laid now.
Saturday, March 31, 2018
A running session
Thursday, February 15, 2018
Percy running
Not much running on the BGLR lately, just some extended runs for Percy. After Maria's problems we are a bit paranoid about our other two Liliput shunters though Percy seems to be running fine.
Monday, February 5, 2018
Single coach
The BGLR usually runs single coach trains due to the small size of the station, plus if the rostered loco is Ruby one coach is all it can pull!
Wednesday, January 17, 2018
Rotation policy
The railway has been a bit quiet at the start of 2018 though there has been some extended running for Ruby which is settling in pretty well though does have the pulling power of a light breeze. Falcon is running well after its six months rest. We thought it would be a good idea to explain our rotation policy.
The railway is only really big enough to host four locos "on rail" at any one time. There are enough sidings for six though it would make operation ridiculously complicated - a bit too much like sokoban. Therefore we have four locos in operation, the engineering trolly is kept on isolated rails in the back scene apart from when its running and one loco is kept in reserve. Falcon was the first to be put in reserve and currently Jam is having a rest. In 6 months Jam will return and one of the other locos (probably Growler) will take its leave.
Now as we get more locos it may be that the rotation policy will have to be amended with it happening more frequently, more locos being put into storage and rest periods being shorter but we will address that when needed.
The railway is only really big enough to host four locos "on rail" at any one time. There are enough sidings for six though it would make operation ridiculously complicated - a bit too much like sokoban. Therefore we have four locos in operation, the engineering trolly is kept on isolated rails in the back scene apart from when its running and one loco is kept in reserve. Falcon was the first to be put in reserve and currently Jam is having a rest. In 6 months Jam will return and one of the other locos (probably Growler) will take its leave.
Now as we get more locos it may be that the rotation policy will have to be amended with it happening more frequently, more locos being put into storage and rest periods being shorter but we will address that when needed.
Friday, January 12, 2018
Isolation
We use a catchpoint as a cheap and easy way of isolating the end of a siding. Currently only the station storage siding has this, Grower is shown below after arriving with a train. We do have another catchpoint which will likely be added to one of the goods sidings when they are relaid later in the year.
Tuesday, December 26, 2017
Monday, December 25, 2017
Saturday, December 23, 2017
Tuesday, December 5, 2017
Operational update
The working fleet all had a run out today. W5 Maria is still out of action which means the fleet is a bit short though Falcon will not be bought back into service early. The BGLR have revealed that a new locomotive will be arriving at the railway at Christmas!
The following photos were taken of today's operations. Percy took one of the freight trains, Jam the push-pull service, Growler ran light engine to allow a change around and the Trolley did some line checks.
The following photos were taken of today's operations. Percy took one of the freight trains, Jam the push-pull service, Growler ran light engine to allow a change around and the Trolley did some line checks.
Subscribe to:
Posts (Atom)













